What Are Pre Engineered Buildings ?

Pre-engineered buildings or PEBs are factory-built components that are manufactured in a factory to an accurate size and only assembled at the actual site. An alternative to conventional structured steel buildings, PEBs are quickly becoming a modern approach to make robust structures. What makes PEBs the best is pre-engineered components which are fabricated using the latest tools at the factory location (under controlled environment), transported, and assembled at the site with large size bolts.

Benefits of Using Pre-Engineered Buildings

The concept of pre-engineered buildings is popular for many reasons. The pre-engineered building structure is flexible and can be customized as you want. Let’s discuss its benefits and understand its utility.

Save Construction Time

While opting for pre-engineered buildings, the significant benefit is it saves construction time. Unlike standard construction, where the process goes long from bid to design to construction to completion, it skips the steps that save time. Here, it can be directly erected without needing welding or bolting. Hence, it can save up to 50% of cost and time.

Seismic Resistance and Durability

Materials that stand out in all seasons are durable and preferable by many. Pre-Engineered Building Manufacturers follow the same concept. They use I-frames, which are robust and can hold heavy loads. Further, new technology allows software stimulation to run on the structure even before it is assembled. Software simulation is an added feature to its durability as it increases the efficiency and quality of the structure.

Cost-Effective

Following the systematic approach, one can save significantly. In pre-engineered building structures, both workforce and material are minimized, which greatly impacts overall cost.

Customization

Pre-engineered buildings allow you to customize as per your choice. You can give it a modern touch or keep it traditional.

  • You can customize interior components like windows, wall lights, and skylights.
  • External components that can be customized include roll-up doors, bi-fold doors, and sectional overhead doors.
  • Along with that, there are available a variety of colors you can choose from. While monochromatic colors are a shade of tint, contemporary colors are cross colors of a wheel, and analogous colors refer to adjacent colors.

Versatility

It can be optimized for various purposes by a Pre-engineered buildings manufacturer in India or elsewhere in the world. Its application includes; auto repair shops, warehouses, and garages.

Environmentally Sustainable

Pre-engineered buildings are also known as prefabricated buildings. It uses steel as its main material, which is supposed to be the most environmentally friendly component. Steel features recyclability and has minimal impact on the environment.

HRS Infrastructure: Best PEB Manufacturer in India

With over a decade of devotion to the clients, HRS Infrastructure has become a leading name to reckon among the Pre Engineered Buildings Manufacturers in India. It has gained a global reputation for its sustainable pre-engineered building solutions for the future.

We serve our clients with comprehensive PEB solutions that turn their acres into a modern and spacious building structure, warehouse & godown, Rooftop, and industrial sheds to name a few.

Our design space is well-equipped with technologically advanced machinery, up-to-the-minute manufacturing practices that can efficiently satisfy a wide range of structural and aesthetic design requirements, and a proficient team having true expertise and years of experience of working in this industry.


See Our Complete Array Of Services
PRE ENGINEERED BUILDING

Best Pre Engineered Buildings Manufacturer

Our Commitment: Unmatched Strength at Affordable Rates

The raw materials we use construct strong innovative structures as per our client’s requirement with maximum efficiency at minimal costs. Being the best Pre Engineered Buildings Manufacturer, our view is to make the whole construction process economically feasible for the clients. Thus, our pre-engineered buildings are usually 20% more economical than any other conventional structure.

How We Complete A PEB Project?

Modern Design and Detailing Solutions

Our project engineers present the latest innovative designs on the table and every required detailing with the help of custom-developed applications and works on the blueprint after it is finalized by the client. PEB construction is 30 to 40% faster than conventional steel building construction. So, we invest maximum time in designing the best layout for you. We incorporate the use of software like STAAD Pro, Autocad, MBS and others.

Design & Engineering

The engineering work in structural steel design is done by IS 800:2007, “Code of practice for General Construction in Steel Structures” as well as IS 875:1987 (Part 1, 2 &3), “Indian Standard Code of Practice for Loads on Buildings and Structures” Our design codes help us to stand at par in the international market. Whereas the automated equipment used for cutting and welding helps in completing the delivery within the defined time-span.

Our PEB Works That Speaks for Us!

1. Our work at NIIT Technologies, Greater Noida involves-

  • 200 MT Of Steel Project with all Amenities
  • Fire Proof Paint
  • Sand Blasted Material
  • ACP Panels etc.

2. Provided complete construction solution at Rajouri Garden – DMRC

3. Provided complete construction solution at Dhaula Kaun – DMRC

4. Pre-engineered building manufacturing of IGNTU, Amarkantak M.P with Total Project Ar. = 200 Acre

  • Building Description:-
  • Main Campus Buildings
  • Staff Quarters
  • G + 2 Boys Hostel
  • G + 2 Girls Hostel

5. HPL Additives Ltd, Faridabad Haryana

6. Amko Sikandrabad, U.P

7. Sand Blasted Material

8. BJK Designs Pvt. Ltd. Faridabad Haryana

View Projects

FAQ'S

Almost every sector now finds Pre-engineered buildings useful for their functioning. This type of building provides seismic resistivity and durability in all seasons. That is why it is used in the industrial sector and sectors where working is robust. These buildings are mainly preferred for factory setup, warehouses, workshops, universities, hospitals, stadiums, parking sheds, community halls, cold storages, railway platforms, airports, commercial showrooms, power plants, and laboratories.
HRS Infrastructure pre-engineered structures best used for industrial sheds, warehouses, cold storages, rooftops, bridges/fob, metro stations, metro depots, universities and institutions, hospitals, conventional centres and stadiums, railway stations, station yards, airports buildings and hangers, multi storey building for residential and offices. Along with that we also offer plant facilities for various major types of machinery.
A pre-engineered building is a cost-effective solution for offices, factories, and others. The significant feature of it is that it is available easily and in any form. You can either buy one part of the entire structure from one or different manufacturers. Generally, the cost to plant a pre-engineered building varies from 600 to 700 per square foot. Nonetheless, the range can fluctuate from supplier to supplier. We also provide pre-engineered buildings at an affordable and reliable cost.
Pre-engineered building construction is a readymade setup that includes structural frames, standard roofs, and wall support. The parts are required to carry on the site, assembled at the site with bolted connections. Thereby, saves labour and other processing costs. The major functional areas in demand are Industrial and Small Manufacturing Buildings, Small Retail and Commercial Office Buildings, and Warehouses and Storage Units.

Why HRS Infrastructure is best for pre-engineered building?

PLANNED PROJECT

The structure used in all pre-engineering projects is well planned to capture output.

HIERARCHY

The hierarchy of each project is unique to meet customer’s demand at cost-effective rate.

On Time Delivery